Electrical CE EPR Bullets


Duty Description

- Supervises X Amn; maintains/installs/inspects/repairs XXX mis of HV elec distr sys's ISO $XXB plane fleet/XXX msns
- Inspects/maintains/repairs XXXK ft of rwy lighting/fire alarm/lightning protection/gnd sys's; shop program manager
- Interprets/analyses schematics/NEC/NFPA stds/UFC/AFIs to maintain infrastructure valued at $XXB; safety monitor
- Maintains/repairs/installs/troubleshoots interior elec sys's in XXX facs valued $XXB; Prime BEEF mobility team mbr



Accomplishments

- Rescued DFAC ops; adjusted 2 A/C charge/restored freezer power--kept $100K perishables/supported 7K meals daily

- Led 4 AMN estab LPS; trench'd/instl'd 18 10' grnd rods/wells 300' cable f/ 4 PEB's--protect'd 1650 psnl/$6.8M equip
- Steered 4 prsn install team; ran 160 ft conduit/cable f/6 outlets--readied future msn ops f/332 ELRS Sq $2.5M fleet
- Elec NCOIC; dir'd 7 prsnl/wire/panel/CB upgrade f/4 bldgs--comp'd 5 PEBs/2-yr proj/ISO $146M MCP/lrgst in AOR
- Mng'd $890K HV proj/led 3 AFSs; trenched 1.6K ft/plc'd 3.2K ft PVC/poured 167 mł PCC--earned ERHS SQ WHoM


- Coord'd 3 orgs; ID'd/isolated/removed 1K lf high-voltage wire/8 light fixtures/junction boxes--'0' delays to 648 sorties
- Reviewed 19 page blue prints; ID'd 6 proj discrepancies/missing $1.8M budget line item--avoided catastrophic failure
- Led 20 mbr tm; ID'd 160 fac const rqmts/complt'd $700K BOM--spt'd 5 AFSCs/ensured 6K sq-ft SF ops proj on-track
- Rvw'd 5 BOMs; ID'd 60 discrep/resourced $10K residue mats--saved $11K in acq costs/10 man-hrs/maint'd proj sched
- Oversaw 16 mbr elec distro tm; ran 900 ft conduit/92K ft wire/30 devices--secured 406 SFS wpns/cache valued $1.5M
- Led 10 mbr tm/6K sq-ft site prep; trenched 500 ft LPS grnd ring/set 225 sq-ft concrete pad--safed 5K prsnl/$1.5M wpns
- LPS SME/led 5; dev'd $7K BOM f/6K sq ft fac/secured 1.5K ft wire/4 grnd rods/16 arresters--est'd LHS f/407 SF prsnl
- Instructed 4 prsnl on Commercial wired: 6 electric panels/120 light fixtures/60 junction boxes--sptd NEC safety codes
- Oversaw 2 mbr tm; dev'd close out punch list--creating final schedule and approx close date f/$700k supply admin fac
- Complt'd elec inv f/$740K EMSG HQ bldg; util'd SME 4 AFSC--ensured correct mat ord'd/saf'd 5K prsnl/$1.5M wpns
- Mng'd 3 orgs; ID'd/isolated/removed 8 AWG 5 KV XLP wire/8 light fixtures/junction boxes--'0' delays to 648 sorties
- Solid mbr/4 prsnl on Commercial wired: 6 electric panels/120 light fixtures/60 junction boxes--sptd NEC safety codes
- Instruct 3 prsnl on commercial wiring: pulling of 500ft linear ft of wiring- ensuring electrical system meets NEC std
- Incite 4 prsnl/$2500K proj; inspected/inventoried $67K in materials--ID'd shortfalls f/12000 sq-ft supply admin PEB
- Led 3 Amn in $2500K DFAC proj;6 electric panels/120 light fixtures/60 junction boxes--sptd NEC safety codes regs
- Orchestrated initial layout f/conduit/wiring; guided elec/FA install f/6k sq ft PEB--complt'd $700k SF OPS assignmnt
- ASST 8 mbr tm/6K in site prep; trenched 500 LF LPS grnd ring/formed 225 sq-ft conc pad--saf'd 5K prsnl/$1.5M wpns
- Completed 12 credits towards MBA; mng'd 6 prsnl/guided 8 PMs--backed AFCENTs #1 const pri/8 projs/$450M MCP
- Oversaw 9 prsnl/$2.4M proj; led inventory of XXXK items worth $250K--ensured DFAC completion 100% on track

- Solved 5 AF flooding issues; installed water pump/svd $560K missile detection sys--secur'd 3 bases/15K pers

- Executed seven SABC classes; 48 engineers life saver qualified--enabled mobility to eight joint mission bases

- Led four Amn in $31K OB light replacement project--complied with strict FAA standards; met PACAF tasker

- Managed weekly schedule for 30 mil/civ; tracked 3.3K hours--completed 252 work orders at a cost of $172K

- Respond'd to commissary meat grinder failure; oversaw critical electrical install--3K+ customers served daily

- Designed/built $2K all inclusive electrical trainer; 20 AFTR tasks complete--30 tech's versed in safe practices

- Aced Elec Sys CDCs; earned 5 skill level 7 mos ahead of sched--tutored 3 Amn to complete upgrade in 6 mos

- Dply'd 180 days, UAE; KO'd 1.6K jobs/pwr'd 573 facs--spt'd OFS/OIR msns/3.8K prsnl/earned WHoM Tm Awd 2x
- Area lighting proj mgr; led 2 prsnl, upgraded 250 fixtures w/LEDs--enforced AF Energy Redux Plan/saved $22K/yr
- Lit up POL yard! Led 3/installed 30 LED fixtures--enhanced visibility & safety f/40 mbrs/secured $3.88M AF assets
- Oversaw CC/DV lodging power failure; ID'd cause/prevented cable disaster--restored pwr to 22 bldgs worth $6.5M
- Nailed Pat Site 7 pwr outage--repaired faulty ATS/powered 3 SDCs for 8 facs--EWS/TBSs online/protected ADAB
- Solved EMDG HVAC issue; ID'd/replaced 50' failed service line <8 hrs--resumed comfort cooling f/90 wkly patrons
- ID'd faulty breakers for regional radar site; repaired PDP--spt'd cryptographic inventory/$5M, tracked 13K acft msns
- Oversaw dorm bathroom reno; designed elect pwr layout drawing/guid'd 3 techs--ensured completion of a $200K proj

- Responded to WSA outage; repaired blown high voltage fuse--re-established FPCON/security of nuc mx compound
- Led oil/water separator fix; restored pwr to control circuits--avoided discharge of 40K gal yrly of contaminated water
- Eliminated WSA gun tower fault; troubleshot circuits/replaced faulty breaker--restored DFP/secured $6.5B nuc assets
- Planned structures metal bender proj; installed 40 ft of conduit/wire/30 amp elect svc--saved > 120 labor hrs annually
- Oversaw MW elevator mx pgm; completed 550 hrs/tested/cert cables/brakes/controls $67M assets--supported 165 psnl
- Managed section HAZMAT pgm; inspected/maintained 2K items--ensured federal reg compliance/zero SAV findings
- Spearheaded WSA turnstile repair; led 2 Amn/replaced transformer--restored sentry ops/safeguarded $68.4M nuc msn
- Attended Electrical Advanced Troubleshooting crs; completed 180 classroom hrs--honed elect & crit thinking skills
- Led 2 Amn; installed mezzanine lighting/control circuits--secured HAZMAT "key to `16 AFGSC large CE unit win!"

- Orchestrated AF Ball electric plan; provided 200 amp svc for cooking equip/DJ--fed/enhanced morale/455 AF mems
- Spearheaded HVAC syst electric upgrade; installed 30 amp breaker--saved AF 30 work hrs/increased QoL 15 pers
- Installed air compressor; replaced contactor/upgraded control transformer--ensured KCC nuclear coding capabilities
- Responded to CDC emergency; replaced electric outlet/tightened termination--guarded 75 children from shock/death
- Led 2 mems BX lighting repair; replaced 8 bulbs/2 ballasts--increased lighting output 25%/eliminated safety hazards
- Coord pipline proj; led 25-mem team/installed $15K in trng aids--eliminated obsolete equip/modernized tech trng aids
- Overhauled 4-acre pole yard; org 114 studs/$43K equip--supported 2 multi-svc crs/3K trng hrs w/zero safety mishaps
- Id'd faulty breakers for regional radar; repaired PDP--powered cryptographic inventory/$5M/tracked 13K ACFT msns
- Attended electric 7-level/High Voltage distrobution crs; earned certs--upgraded/trained 3 Amn/increased tech skill set
- Revamped electric trng Heritage icon; led 8-mem team/reconstructed pole yard bridge--enchanced legacy 2.4K studs
- Oversaw $200K dorm reno; designed electric layout drawing/guided 3 techs--completed proj 4 mos ahead of schedule
- Nailed Patriot battery pwr outage fix--repaired ATS/energized 3 SDCs/8 bldgs--EWS/TBSs online/protected ADAB
- Deployed UAE; completed 1.6K WTs/fixed 573 bldgs--spt'd OFS/OIR msns/3.8K pers/earned WHoM Team awd 2x




Cough up some EPR bullets, you slackers!


Enter comments below and click Send