POL EPR Bullets


- Authored 1st asset deployment checklist; streamlined vehicle processing procedures--enabled 100% readiness




- Backed SecAF EMP prgm; teamed w/AFCO/AFPA to develop $13M ATJ fuel tests--1st aerial msn successful




- Cmd'd fuel ops for POTUS; instructed delivery of 56K JP-8 gals to 14 spt acft--South America visit a success
- Coached PM's semiannual Vehicle Mgmt insp; prepared $6M refueling fleet--earned two "Outstanding" ratings
- Conquered faulty R-11 tortion bar assemblies; safeguarded $825K of assets--averted potential equip mishaps
- Coord'd 2K gals fuel issued to TACP; spt'd 440 trng hrs/160 students--resulted in 188 cmbt trng obj completed
- Crafted Flt's tool control trng prgm; boosted 127 mbrs grasp of FOD prevention--7.5K tool inventory secured




- Dictated fuel spt for Patriot Missile test; ensured 1K gals of JP-8 issued--IOC met prior to UAE wpns delivery
- Direct'd review of 30 lcl chklst; 20 corrective actions--earned "Outstanding" rating on Sq QA semi-annual insp
- Directed 105 R-11 reconfig's; sealed 92% MC rate/beat cmd goal 7%--enabled 15M gals of JP-8 to 9K sorties
- Directed five agencies during 3-day spill cleanup; reduced environmental impact--saved $12K in cleanup fees
- Directed MK-82 cookoff spt; ensured JDAM evaluated/shipment reqs exceeded--CENTCOM request fulfilled




- Effectively controlled 3 facilities/6 refueling assets; 24-hr fuel spt to AFSOC R/W tasking--1.5K flying hrs met
- Enforced EPA regulations; 19 tanks/5.5M gals of fuel safely contained--zero findings during six FL EPA insps
- Expertly led 15 prsnl/2 shifts; spearheaded 900K gals JP-8 issues/500 acft--powered 919 SOW/7 SFG msns




- Facility manager; ensured movement of 11M gals of DLA-E fuel--earned two semiannual "Outstanding" ratings
- Flt "Amn of Month" board president; led 3-mbr panel/upheld process integrity...recognized flt's best of the best
- Flt Airfield Driving Prgm Mgr; qual'd 10 operators on active rwy crossing--100% msn ready...zero incidents
- Fueled 7 SFG SOUTHCOM/OEF deployments; 450K gals JP-8/63 acft--enabled C-17 non-stop flights to AOR




- Guided Duke Fld self insp prgm; reviewed 171 chklst items/no findings '12 HQ LCAP--Sq rated "Outstanding"
- Guided fuels safety prgm; zero findings during AAC annual insp--Wg grnd safety benchmarked three processes
- Guided issue of 52K gals of grnd fuels; powered 40 sites/800 facilities--sustained ops for 724 sq mile range




- Headed TACP grnd fuel spt; routed 1K gals DL2 to 160 SOF students--galvanized 440 trng hrs w/zero delay

- Implemented critical mx upgrades; enhanced ability of 23 R-11s to safely issue 16M gals/JP-8--zero msn delay

- Key to '12 Emerald Warrior Ex; 95K gals of JP-8 issued to C-17s--ensured critical comm trng for cargo pilots




- Led Eglin/NWFL airport jt MARE/MASCAL exer; id'd nine strengths--sharpened Eglin/local responders' SOP
- Led spt to Captive Flight tests; 2K gals JP-8 to UH-01s--galvinized precise firepower capability to warfighter




- Managed $4.8M infrastructure; mitigated 50% storage capacity loss--sustained ops despite 38% msn increase
- Managed 80+ pers; directed delivery of 15M gals JP-8/52K gals grnd products--vital for wpns reseach & eval
- Managed fuel spt 96 TW $820M+ R&D prgm; 3M gals/enabled proj on time/zero delay--2K sorties generated
- Meticulous mgmt; reviewed/revised 70 checklists/34 Fuel OIs--enhanced safety/standardized ops for 11 areas




- Oversaw 4-man PM checkpoint team; passed 12 Sq QA spot checks--performed 37 spot repairs/93% MC rate
- Oversaw historic USMC STOVL F-35 refuel; 1.6K gals of JP-8 delivered--ensured initial acft test successful




- Paramount to CV-22 hot pit ops; ensured 23 hoses met API cert--2K gals JP-8 issued/wpns software validated




- Quarterbacked hot refueling cert team; guided 15 mbrs for site survey--1st EAFB F-35 hot pit location initiated
- Quarterbacked tank overhaul proj; two 100K gals tanks upgraded to current std--restored 100% ops capability




- Revamped Duke Fld Ops lesson plans; steered OJT on 181 work center tasks--earned MSG's 3d Qtr SNCOQ




- Sampled 1M gals JP-8 receipts ops worth $3.9M; 1.2K in-depth lab analyses--ensured product 100% on-spec
- Selected 96 MSG SAP monitor; guides 5 Sqs/10 mbrs validating CAPs--arms CCs w/unit health & compliance
- Sq lead 96 ABW Wingman Day; coordinated events/feedback for 5 flts--promoted camaraderie/teambuilding
- Streamlined/reduced daily checkpoint process 25%; id'd/fixed ten checklist items--saved 112 man hrs monthly
- Successfully piloted two CTK merger worth $10.5K; meticulous oversight on 262 tools--100% accountability
- Superior Team Eglin fuel spt; overseer of $69.1M infrastructure--key to '12 CINC Installation Excellence Awd
- Synchronized POTUS refueling spt ops; guaranteed safe delivery of 10K gals of JP-8--praised by acft cmdr




- Validated 171 self-insp items; key to Sq "Outstanding" rating '12 AFMC LCAP insp--applauded "First in cmd"





Enter contributions below and click Send. Thanks!